Preparation of the floor foundation

When the characteristics of the concrete spread on the floor are optimal (porosity, mixture water/cement, size of the grain etc.), the surface of the foundation has to be “closed” with MOMQUARZ, then the upper part is levelled with the “helicopter”. If the analysis with the screed requires it, first the surface has to be squared to guarantee the ideal fixing.